№ 01 · The window's journey

Seven stages. One team. One person who answers.

Window production doesn't happen in a day. It's measured, drawn, cut, assembled, installed — and at every stage you know who's responsible. Here's the real flow, not a marketing slideshow.

Stages
  1. 01

    Site visit and measurement

    A craftsman comes to you within 24–48 hours. The opening is checked with a laser measure. We look at wall deflection, water-drain angles, opening flatness — all of it matters at install.

    After measurement, a photo report is prepared. You receive a PDF spec — width, height, depth — in the same format the configurator uses.

    Accuracy
    0.5mm
  2. 02

    Design and drafting

    Your configurator choices + the craftsman's measurements go into CAD. We verify the thermal break, hardware compatibility, opening correction — before any production starts.

    Usually 1–2 days. Complex projects (4m+ panoramic, bay windows) take 3–4 days.

    Verification
    CAD+ by hand
  3. 03

    Profile delivery

    Aluminium ships from Alumil's Tbilisi warehouse. PVC from the Rehau branch. Lead time — 5–8 business days from order confirmation.

    Delivered profile is indexed separately for your site. It doesn't get mixed with anyone else's order.

    Lead time
    5–8days
  4. 04

    Cutting and machining

    Numerically controlled cuts at 45° or 90°, then hand-finishing. Water-drain channels are routed; hardware holes drilled by hand from a template.

    Every piece is marked with your order number — hardware holes never get mixed across windows.

    Saw tolerance
    ± 0.1mm
  5. 05

    Window assembly

    Frame is bolted together; corners are heat-welded. Hardware follows — handle, latch, lock, thermal silicone seal around the perimeter.

    One craftsman works on one window at a time — not a conveyor. It's slower, but there's no alternative to hardware precision.

    Throughput
    1/craftsman
  6. 06

    Glazing and QA

    Low-E or triplex glass arrives from the Gori facility as a pre-assembled IGU. It's set into the frame; seal tightness is verified.

    Every assembled window goes through QA: warp test, lock test, thermal-seal visual inspection. Sign-off on the inspection sheet by the craftsman.

    QA pass
    100%
  7. 07

    Installation at your site

    Our installer — never an outside crew. Arrives in the workshop van. Old window removed, new one fitted, thermal silicone perimeter, water-drain check.

    Installation in Batumi is free. Kobuleti/Ozurgeti/Kutaisi — only the delivery cost the configurator computes from your address.

    Batumi
    Freeinstall